Posted November 17th, 2015
- Storm Water Project Successful
- The new large storm water mitigation structure near Parking Lot 5, on the south side of campus, handled a massive rainstorm runoff that occurred last month, moving thousands of gallons of water through the three-tiered system Posted November 17, 2015