Posted December 21st, 2010
- Program planning at Rock Creek with faculty, staff and students
- The PCC Rock Creek Design Team hosted a planning charrette on November 22 with campus stakeholders to develop a series […] Posted December 21, 2010
- Dehumidifiers installed at Sylvania pool
- Two Desert Aire dehumidifier units – 20 feet in length and 10 feet in height – have been installed in the HT Building by Howard S. Wright Constructors Posted December 21, 2010